## Energy efficient projects

In the period from 2013 to 2016, Alkaloid AD used the financing opportunity for energy efficient projects and projects in the field of renewable energy sources of the WeBSEFF (Western Balkans Sustainable Energy Financing Facility) credit line, provided by the European Bank for Reconstruction and Development and the European Commission, that aims at providing loans to companies from the Western Balkans (Macedonia, Bosnia and Herzegovina, Serbia and Croatia).  

For the projects to be accepted for financial support, the condition was to achieve energy savings of at least 20%, to reduce greenhouse gas emissions by more than 20%, as well as to comply with national environmental requirements, health and safety standards and accordingly, to provide all necessary permits. The main benefits of the projects are energy saving, return on investment through energy saving, upgrading of technology lines and equipment, as well as building the image of a socially responsible company that cares about the protection of the environment. 

During that period, Alkaloid AD implemented several projects in Skopje, as well as one in Belgrade. Solar collectors were installed for heating hot sanitary water, modernization of the heating system in the educational center in Dojran, installation of a low-temperature hot-water gas boiler for heating the Quality control Pharmacy building, raw materials and packaging warehouse and annex facilities. We continuously invest in energy efficient roof and facade systems, as well as windows with low heat transfer coefficient.

In addition to the procurement of new energy efficient equipment, we pay attention to automation and optimization of all systems that use any type of energy. In October 2015 in Zagreb, Alkaloid AD was awarded first prize for a successful implementation of energy efficient project. 

The total amount of the WeBSEFF credit line used by Alkaloid AD was around 1.500.000 EUR. 

**1\. Project- Solar collectors installation (value: 60.000,00 EUR)** 

A total of 60 solar collectors with a 150mW collector area have been installed on the following facilities: 

-   Institute for research and development Pharmacy, Avtokomanda facility, 
    
-   Production of cephalosporins (PPSC), Gjorche Petrov facility, 
    
-   Alkaloid AD educational center in Dojran and 
    
-   Facility Restorant, facility Avtokomanda. 
    

The goal of the project is installing solar thermal collectors for obtaining hot sanitary water. 

**2\. Project – Reconstruction with repurposing of part of the facility for Production of cosmetics in Warehouses for finished products - Cosmetics, Gjorche Petrov facility. (value 45.000,00 EUR)** 

The aim of the project is installation of Ecopanels type WLC for facades, with a thickness of 100 mm, with a coefficient of thermal permeability which is 0,21K (W/m2K) on an area of 1831,46 m². 

**3\. Project – Installation of a heat pump with accompanying installation for heating and cooling in a facility for Production of cosmetics (value: 300.000,00 EUR)** 

The installation of the heat pump with heating factor which is the ratio of the heat provided by the heat pump for heating/cooling and the consumed electricity for this heat pump is COP=4,68. The capacitor device that is connected to the motor in parallel, provides a constant COSφ=0,95 and a reduction of the input power supply up to 10%, which is an additional electricity saving. 

**4\. Project – Replacement of existing light bulbs with energy efficient light bulbs (value: 95.000 EUR)** 

By replacing the existing light bulbs with energy efficient light bulbs electricity savings were achieved in the following facilities: 

-   Facility - Cosmetics Factory, part Warehouse for raw materials and packaging Cosmetics, Gjorche Petrov facility, 
    
-   Facility - Cosmetics Factory, Warehouse for final product Cosmetics and Pharmacy, Gjorche Petrov facility, 
    
-   Facility – Warehouse for final products, Avtokomanda facility and 
    
-   Ground floor lighting, Avtokomanda facility. 
    

The buildings are equipped with 4 x 50W bulbs or 2 x 80W bulbs, and both types of bulbs are highly efficient Class A, with fluorescent T5 bulbs and IP 65 protection. 

**5\. Project - External reconstruction of building A1- Production Pharmacy, production of semi-solid, liquid and ampoule medical forms,  Avtokomanda facility (value 200,000 EUR)** 

The aim of this project was renewal, repair and reconstruction of the roof and facade surfaces. The reconstruction of the building significantly improved the protection from atmosphere and heat influences and achieved energy savings.  

The investment project included the following works: 

• Reconstruction of the roof with a sloping ventilated roof, 

• Reconstruction of the facade by installing a new thermal facade with d=10cm insulation, 

• Replacement of windows with new four season low emission thermopane glass, type 4x12x4 mm aluminum windows. 

**6\. Project – Reconstruction with repurposing of existing building in “Quality Control Pharmacy#, Avtokomanda facility (value 500,000 EUR)** 

The reconstruction of the building significantly improved the protection from atmosphere and heat influences and achieved energy savings. 

The following works were performed for the reconstruction and repurposing of the existing building: 

-   Replacement of windows with new four season low emission thermopane glass, type 4x12x4 mm aluminum windows,  
    
-   Reconstruction of the facade by installing a new thermal facade with d=10cm insulation,  
    
-   Reconstruction of the roof with aluminum panel roof,  
    
-   Replacement of a freight elevator with a new elevator with a load capacity of 800kg, 
    
-   Replacement of thermotechnical equipment and installations  
    

\-  Replacement of fuel oil boiler and steam installation with gas hot-water boiler and installation, for obtaining hot water , 

\- Replacement of existing air conditioning system (air chambers and heating units) with central cooling machine and electrical installation,  

-   Installation of 20 solar collectors,  
    
-   Replacement of existing light bulbs with energy efficient light bulbs and accompanying equipment in the Quality control building and the Warehouse for raw materials and packaging. 
    

**7\. Project – Windows replacement in the existing building “Management building”, Avtokomanda facility (value 160.000 EUR)** 

By replacing all the windows and modification of the walls around the window openings of the building, the protection from atmosphere and heat influences was significantly improved and energy savings were achieved. The following was performed for the reconstruction of the existing building: 

-   Replacement of windows with new four season low emission thermopane glass, type 4x12x4 mm aluminum windows, 
    
-   Modification of walls around window openings, closing of blinds openings, installation of insulation on exterior walls, replacement of aluminum ceiling. 
    

**8\. Project - Reconstruction of the thermo-technical installation in the Drug Factory, object C, primary packaging, in Alkaloid doo Belgrade (value 136.000 EUR)** 

Within this project, the existing air conditioning system K1 was replaced, in order to control and regulate the humidity in the premises for primary packaging of drugs. 

## List of Energy Efficiency Projects

Savings-Benefits

Project No.

Start Date

Energy Efficiency Measure

Cost (EUR)

Fuel-Resource Type

Monetary (EUR/year)

Energy (MWh/year)

Water (m³/y)

Description and Other Benefits

Realization Finish

16

2018

Valve Jackets For Boiler Room in Avtokomanda

2458

NG

15

461

2458 Euros with 0.3y ROI 0.75% of EE improvement 250 MWh/year thermal saved 461 MWh/year NG saved = 15.000 EUR/year

10/1/2018

17

2018

Insulation and new windows for Security and Firefighting Building in Avtokomanda

35000

NG

8.46

260

Thermal Reduction of 130 MWh - from 200 to 70 (MWh/year) = NaturalGas Reduction of 260 MWh/year + 305m2 new administration area

3/1/2019

18

2018

Insulation and new windows for HQ Building in G.Petrov

35000

NG

15.873

429

Thermal Reduction of 143 MWh - from 218 to 75 (MWh/year) = Heat Oil Reduction of 429 MWh/year + 323m2 new administration area, Lower Regulatory and Hazard Risk because of additional firefight staircase

4/15/2019

19

2018

Air-conditioner based heating for HQ Building in G.Petrov (instead of steam based heating) - 40 AirConditioners

14000

NG

6.836

206

Switch from Heating Oil to Electricity =3\*75 to 75 MWh/y reduction + AirConditioner - HeatPump Reduction = SCOP = 4, which means reduction from 75 to 18.75

4/15/2019

20

2018

Air-conditioner based cooling for HQ Building in G.Petrov (instead of chiller) - 40 AirConditioners

\-58000

Е

209

3

SEER of 6.1 instead of 3.69 and 14000 instead of 62000 EUR for 6.77 - 4.09 = 2.68 MWh less electricity

4/15/2019

21

2019

Change of supply steam pipeline for Cosmetics Plant from D=250 to existing D=100mm

25725

NG

15

230

The pipeline supply lost had fall for 75% because of significantly lower diameter of other existing pipeline that needed only minor adjustments and change of already old valves and pipes

10/1/2019

22

2019

New natural gas pipeline, new steam boiler, switch from Heavy fuel to natural gas heating energy in Gorce Petrov

1000000

NG

169

1.065

Ecological benefits

4/1/2020

40

2019

Resalta-New Stainless Steel condensate reservoir for Boiler room Avtokomanda (as part of reconstruction investment measure)

30000

NG

6.638

204

2% of 10217 MWh/year=204 (leakage because of old reservoir of carbon steel)

7/1/2019

41

2019

New Valves for Boiler room Avtokomanda

100000

NG

9.957

306

3% of 10217 MWh/year=306 (leakage because of old reservoir of carbon steel)

7/1/2019

42

2019

Expansion of central wardrobes in Avtokomanda - EE lightning

50000

Е

42.757

1.314

10 x 15W x 365 x 24 / 1000

7/1/2019

43

2019

Insulation of Warehouse for Finished products in Avtokomanda

81400

NG

2.48

45

Insolation of 2000m2 facade for 2000m2\*(6.1MWh/year down to 0.98) = 10000, Lower Product Risk

8/1/2019

44

2019

Insulation of Warehouse for Finished products in Avtokomanda

0

Е

1.34

27

2000m2 \* (.824-.131) = 1386 MWht/y

8/1/2019

45

2019

EE Lights - Reconstruction of Warehouse for Chemistry Products - G. Petrov

25000

Е

551

10

10

1/1/2020

46

2019

EE Lights - Yard - G. Petrov

30000

Е

1.489

30

20

1/1/2020

48

2019

Facade Insulation of Warehouse for raw materials - Hangar - Bilka

200000

R

29000

479

Заштита-заштеда на суровини-репроматеријали

1/1/2020

49

2021

Reconstruction of Electrical Installation in B object

5000

Е

496

10

2% of 485MWh/y Lower Fire Risk and other Hazards Risk

1/1/2020

54

2019

Closing return bypass valve of secondary water circuit of heating pump

10

W

30

100

Reducing costly water loss on distribution water networks through leak detection and Non-Revenue Water Management strategies and methodologies

10/2019

62

3/12/2020

DR - Piston compressor for Viessmann steam boiler n

108

Е

57

0.908

ROI 0.1 y Simple PP: 1.9y

4/12/2020

84

2020

For Boiler Room in Gjorce Petrov

1200

NG

1200

37

7/1/2020

85

2020

Condensate Return from Antibiotics Plant

15764

NG,W, NaCl

2500

61

60MWh/y = 730tH2O = 720 x 0.3EUR = 216EUR + 730 \* 300 / 3600MWh = 61MWh/y = 2000EUR + 73 0 \* NaC = 216EUR

86

2020

Hot water instead of steam heating for Packing Chemistry

52009

NG,W, NaCl

89

2020

Repair of the water supply and PP network along with the repair of the valve in the toilets in the Bilka facilities and repair of toilet tanks

2207

W, E

21.105

16024

Increased security - lower risk of PP - Firefighting installation which means lower risk to products and fascilities, lower risk of damage to installation.

2/15/2021

90

9/1/2020

Water saving devices - 7 tap aerators and 7 regulators for toilet tanks in Bilka

80000

E,NG,W, NaCl

91

12/1/2020

Repair of water supply network together with repair of valves in toilets in Avtokomanda and repair of toilet tanks

4557

W,E

4,061

16024

Increased security - lower risk of PP - Firefighting installation which means lower risk to products and facilities, lower risk of damage to installation.

3/1/2021

92

12/1/2020

Water saving devices - 7 tap aerators and 7 regulators for toilet tanks in Bilka

147

W,E

590

453.83

2/24/2021

93

12/1/2020

Repair of water supply network together with repair of valves in toilets in Avtokomanda and repair of toilet tanks

4557

W, E

14,014

18,218.20

Increased security - lower risk of PP - Firefighting installation which means lower risk to products and fascilities, lower risk of damage to installation.

3/1/2021

94

2021

New 4 dedusting units for the Tablet Production

76000

E

8000

98

Lowering production disruptions because of malfunction of old units, Lower level of noise.

2021

95

9.2021

Additional Investment in more EE and more ECO friendly chiller for R&D Institute for Chemical Products (Chemodialisis production)

8000

E

1000

26

6.4t of CO2 emmision reduction

2022

96

2021

Automatization of Fire Fighting reservoair empting

12000

B

25000

50000

Better overview of the FF reservoair - better FF safety. Better overview of the water temperature for the cooling in production - higher production

2021

97

2021

Valve Jackets

2000

НГ

2000

67

Lowering the danger of hot surfaces, CO2 emmisions

2021

98

4/19/2021

Уреди за заштеда на вода аератори за чешми и регулатори за казанчиња за Автокоманда

1413

B, E

5,465

7,346.63

Дополнителна хигиена - GMP, помал ризик од неоткриени истекувања, помал ризик за производството или производите

2021

99

4/23/2021

Institute for Research and Development - Air conditioning chamber with an adsorbtion wheel with bypass versus with no bypass for dry air

НГ, Е, В

26,000

867

2021

104

10/1/2021

Use of teflon (PTFE) and advanced teflon eFRM G,F,Hepa and Ulpa filters in AHUs

0

E

48000

600

20% more EE filters = 4% of total Electricity = 600MWh =48.000 EUR/y + 600t CO2/y reduction = potentially 30.000 EUR

2022

105

12.2021

12 of 15 PV plants with total of 1.3MWep

715000

E

300000

1500

Lower CO2 footprint which is also a marketing or sales adut

2022

106

2022

Chiler for Cosmetics in Preparation Process

10000

W

6950

5000

Increase of production because of more adequate temperature for cooling all year long and achiving tempearatures not possible with well water cooling

2022