Energy Efficiency Projects


 

In the period from 2013 to 2016, Alkaloid AD used the financing opportunity for energy efficient projects and projects in the field of renewable energy sources of the WeBSEFF (Western Balkans Sustainable Energy Financing Facility) credit line, provided by the European Bank for Reconstruction and Development and the European Commission, that aims at providing loans to companies from the Western Balkans (Macedonia, Bosnia and Herzegovina, Serbia and Croatia).  

For the projects to be accepted for financial support, the condition was to achieve energy savings of at least 20%, to reduce greenhouse gas emissions by more than 20%, as well as to comply with national environmental requirements, health and safety standards and accordingly, to provide all necessary permits. The main benefits of the projects are energy saving, return on investment through energy saving, upgrading of technology lines and equipment, as well as building the image of a socially responsible company that cares about the protection of the environment. 

During that period, Alkaloid AD implemented several projects in Skopje, as well as one in Belgrade. Solar collectors were installed for heating hot sanitary water, modernization of the heating system in the educational center in Dojran, installation of a low-temperature hot-water gas boiler for heating the Quality control Pharmacy building, raw materials and packaging warehouse and annex facilities. We continuously invest in energy efficient roof and facade systems, as well as windows with low heat transfer coefficient.

In addition to the procurement of new energy efficient equipment, we pay attention to automation and optimization of all systems that use any type of energy. In October 2015 in Zagreb, Alkaloid AD was awarded first prize for a successful implementation of energy efficient project. 

The total amount of the WeBSEFF credit line used by Alkaloid AD was around 1.500.000 EUR. 

1. Project- Solar collectors installation (value: 60.000,00 EUR) 

A total of 60 solar collectors with a 150mW collector area have been installed on the following facilities: 

  • Institute for research and development Pharmacy, Avtokomanda facility, 

  • Production of cephalosporins (PPSC), Gjorche Petrov facility, 

  • Alkaloid AD educational center in Dojran and 

  • Facility Restorant, facility Avtokomanda. 

The goal of the project is installing solar thermal collectors for obtaining hot sanitary water. 

2. Project – Reconstruction with repurposing of part of the facility for Production of cosmetics in Warehouses for finished products - Cosmetics, Gjorche Petrov facility. (value 45.000,00 EUR) 

The aim of the project is installation of Ecopanels type WLC for facades, with a thickness of 100 mm, with a coefficient of thermal permeability which is 0,21K (W/m2K) on an area of 1831,46 m². 

3. Project – Installation of a heat pump with accompanying installation for heating and cooling in a facility for Production of cosmetics (value: 300.000,00 EUR) 

The installation of the heat pump with heating factor which is the ratio of the heat provided by the heat pump for heating/cooling and the consumed electricity for this heat pump is COP=4,68. The capacitor device that is connected to the motor in parallel, provides a constant COSφ=0,95 and a reduction of the input power supply up to 10%, which is an additional electricity saving. 

4. Project – Replacement of existing light bulbs with energy efficient light bulbs (value: 95.000 EUR) 

By replacing the existing light bulbs with energy efficient light bulbs electricity savings were achieved in the following facilities: 

  • Facility - Cosmetics Factory, part Warehouse for raw materials and packaging Cosmetics, Gjorche Petrov facility, 

  • Facility - Cosmetics Factory, Warehouse for final product Cosmetics and Pharmacy, Gjorche Petrov facility, 

  • Facility – Warehouse for final products, Avtokomanda facility and 

  • Ground floor lighting, Avtokomanda facility. 

The buildings are equipped with 4 x 50W bulbs or 2 x 80W bulbs, and both types of bulbs are highly efficient Class A, with fluorescent T5 bulbs and IP 65 protection. 

5. Project - External reconstruction of building A1- Production Pharmacy, production of semi-solid, liquid and ampoule medical forms,  Avtokomanda facility (value 200,000 EUR) 

The aim of this project was renewal, repair and reconstruction of the roof and facade surfaces. The reconstruction of the building significantly improved the protection from atmosphere and heat influences and achieved energy savings.  

The investment project included the following works: 

• Reconstruction of the roof with a sloping ventilated roof, 

• Reconstruction of the facade by installing a new thermal facade with d=10cm insulation, 

• Replacement of windows with new four season low emission thermopane glass, type 4x12x4 mm aluminum windows. 

 

6. Project – Reconstruction with repurposing of existing building in “Quality Control Pharmacy#, Avtokomanda facility (value 500,000 EUR) 

The reconstruction of the building significantly improved the protection from atmosphere and heat influences and achieved energy savings. 

The following works were performed for the reconstruction and repurposing of the existing building: 

  • Replacement of windows with new four season low emission thermopane glass, type 4x12x4 mm aluminum windows,  

  • Reconstruction of the facade by installing a new thermal facade with d=10cm insulation,  

  • Reconstruction of the roof with aluminum panel roof,  

  • Replacement of a freight elevator with a new elevator with a load capacity of 800kg, 

  • Replacement of thermotechnical equipment and installations  

-  Replacement of fuel oil boiler and steam installation with gas hot-water boiler and installation, for obtaining hot water , 

- Replacement of existing air conditioning system (air chambers and heating units) with central cooling machine and electrical installation,  

  • Installation of 20 solar collectors,  

  • Replacement of existing light bulbs with energy efficient light bulbs and accompanying equipment in the Quality control building and the Warehouse for raw materials and packaging. 

 

7. Project – Windows replacement in the existing building “Management building”, Avtokomanda facility (value 160.000 EUR) 

By replacing all the windows and modification of the walls around the window openings of the building, the protection from atmosphere and heat influences was significantly improved and energy savings were achieved. The following was performed for the reconstruction of the existing building: 

  • Replacement of windows with new four season low emission thermopane glass, type 4x12x4 mm aluminum windows, 

  • Modification of walls around window openings, closing of blinds openings, installation of insulation on exterior walls, replacement of aluminum ceiling. 

 

8. Project - Reconstruction of the thermo-technical installation in the Drug Factory, object C, primary packaging, in Alkaloid doo Belgrade (value 136.000 EUR) 

Within this project, the existing air conditioning system K1 was replaced, in order to control and regulate the humidity in the premises for primary packaging of drugs. 

 

 

List of Energy Efficiency Projects

Savings-Benefits
Project No.Start DateEnergy Efficiency MeasureCost (EUR)Fuel-Resource TypeMonetary (EUR/year)Monetary (EUR/year)Water (m³/y)Description and Other BenefitsRealization Finish
162018Valve Jackets For Boiler Room in Avtokomanda 2458NG154612458 Euros with 0.3y ROI 0.75% of EE improvement 250 MWh/year thermal saved 461 MWh/year NG saved = 15.000 EUR/year10/1/2018
172018Insulation and new windows for Security and Firefighting Building in Avtokomanda35000NG8.46260Thermal Reduction of 130 MWh - from 200 to 70 (MWh/year) = NaturalGas Reduction of 260 MWh/year + 305m2 new administration area3/1/2019
182018Insulation and new windows for HQ Building in G.Petrov35000NG15.873429Thermal Reduction of 143 MWh - from 218 to 75 (MWh/year) = Heat Oil Reduction of 429 MWh/year + 323m2 new administration area, Lower Regulatory and Hazard Risk because of additional firefight staircase4/15/2019
192018Air-conditioner based heating for HQ Building in G.Petrov (instead of steam based heating) - 40 AirConditioners14000NG6.836206Switch from Heating Oil to Electricity =3*75 to 75 MWh/y reduction + AirConditioner - HeatPump Reduction = SCOP = 4, which means reduction from 75 to 18.754/15/2019
202018Air-conditioner based cooling for HQ Building in G.Petrov (instead of chiller) - 40 AirConditioners-58000E2093SEER of 6.1 instead of 3.69 and 14000 instead of 62000 EUR for 6.77 - 4.09 = 2.68 MWh less electricity4/15/2019
212019Change of supply steam pipeline for Cosmetics Plant from D=250 to existing D=100mm25725NG15230The pipeline supply lost had fall for 75% because of significantly lower diameter of other existing pipeline that needed only minor adjustments and change of already old valves and pipes10/1/2019
222019New natural gas pipeline, new steam boiler, switch from Heavy fuel to natural gas heating energy in Gorce Petrov1000000NG1691.065Ecological benefits4/1/2020
402019Resalta-New Stainless Steel condensate reservoir for Boiler room Avtokomanda (as part of reconstruction investment measure)30000NG6.6382042% of 10217 MWh/year=204 (leakage because of old reservoir of carbon steel)7/1/2019
412019New Valves for Boiler room Avtokomanda100000NG9.9573063% of 10217 MWh/year=306 (leakage because of old reservoir of carbon steel)7/1/2019
422019Expansion of central wardrobes in Avtokomanda - EE lightning50000E42.7571.31410 x 15W x 365 x 24 / 10007/1/2019
432019Insulation of Warehouse for Finished products in Avtokomanda81400NG2.4845Insolation of 2000m2 facade for 2000m2*(6.1MWh/year down to 0.98) = 10000, Lower Product Risk8/1/2019
442019Insulation of Warehouse for Finished products in Avtokomanda0E1.34272000m2 * (.824-.131) = 1386 MWht/y8/1/2019
452019EE Lights - Reconstruction of Warehouse for Chemistry Products - G. Petrov25000E55110101/1/2020
462019EE Lights - Yard - G. Petrov30000E1.48930201/1/2020
482019Facade Insulation of Warehouse for raw materials - Hangar - Bilka200000R294791/1/2020
492019Reconstruction of Electrical Installation in B object5000E496102% of 485MWh/y Lower Fire Risk and other Hazards Risk1/1/2020
542019Closing return bypass valve of secondary water circuit of heating pump 10W30100Reducing costly water loss on distribution water networks through leak detection and Non-Revenue Water Management strategies and methodologies10.2019
623/12/2020DR - Piston compressor for Viessmann steam boiler108E570.9084/12/2020ROI 0.1 y Simple PP: 1.9y
842020For Boiler Room in Gjorce Petrov1200NG1200377/1/2020
852020Condensate Return from Antibiotics Plant15764NG,W, NaCl250061460MWh/y = 730tH2O = 720 x 0.3EUR = 216EUR + 730 * 300 / 3600MWh = 61MWh/y = 2000EUR + 73 0 * NaC = 216EUR
862020Hot water instead of steam heating for Packing Chemistry52009NG,W, NaCl
872020Led lights instead of Fluorescent in Cosmetics WarehouseE1/1/19750.025(12ground + 24firstfloor) * 72W = 2592W of fluorescent lights are changed with 14x54W (ground floor) + 21 x 46 (first floor) + additional (because of closing of glass windows needed for lowering the temperatures) 16x54W = 2586W. Direct Electricity Savings of (2592-2586) * 260days*16 = 24960Wh = 25kWh = 0.025MWh = 1.75 EUR
889/15/2020Repair of a toilet valve in the Cosmetics Warehouse and repair of toilet tanks30W25550036509/30/2020
8912/1/2020Repair of the water supply and PP network along with the repair of the valve in the toilets in the Bilka facilities and repair of toilet tanks2207W, E21.10516024Increased security - lower risk of PP - Firefighting installation which means lower risk to products and fascilities, lower risk of damage to installation.2/15/2021
909/1/2020Water saving devices - 7 tap aerators and 7 regulators for toilet tanks in Bilka80000E,NG,W, NaCl
9112/1/2020Repair of water supply network together with repair of valves in toilets in Avtokomanda and repair of toilet tanks4557W,E4,061 16024Increased security - lower risk of PP - Firefighting installation which means lower risk to products and facilities, lower risk of damage to installation.3/1/2021
9212/1/2020Water saving devices - 7 tap aerators and 7 regulators for toilet tanks in Bilka147W,E590453.83 2/24/2021
9312/1/2020 Repair of water supply network together with repair of valves in toilets in Avtokomanda and repair of toilet tanks4557W, E14,01418,218.20Increased security - lower risk of PP - Firefighting installation which means lower risk to products and fascilities, lower risk of damage to installation.3/1/2021
942021 New 4 dedusting units for the Tablet Production76000E800098Lowering production disruptions because of malfunction of old units, Lower level of noise. 2021
959.2021Additional Investment in more EE and more ECO friendly chiller for R&D Institute for Chemical Products (Chemodialisis production)8000E1000266.4t of CO2 emmision reduction2022
962021Automatization of Fire Fighting reservoair empting12000W2500050000Better overview of the FF reservoair - better FF safety. Better overview of the water temperature for the cooling in production - higher production2021
972021Valve Jackets2000NG200067Lowering the danger of hot surfaces, CO2 emmisions2021
984/19/2021Water-saving devices, tap aerators and toilet tank regulators for Avtokomanda1413W, E 5,4657,346.63Additional Hygene - GMP, lower risk for undetected leakages, lower risk to production or products2021
994/23/2021 Institute for Research and Development - Air conditioning chamber with an adsorbtion wheel with bypass versus with no bypass for dry air NG, E, W26,0008672021
1025/11/2021Use of air conditioners for heating instead of heating with steam radiators 1000Oil,W, NaCl26138457.5 Air conditioners produce 25x3.5x5x30x8/2=52.5MWh which saves 52.5x9=472.5 MWh of oil = 472.5x57 euros = 26,933 euros, and consume 15MWh of electricity x 70 euros = 1050 euros, i.e. a net saving of about 25,883 euros. In addition, air conditioners can also be used for cooling. 5/11/2021
10410/1/2021Use of teflon (PTFE) and advanced teflon eFRM G,F,Hepa and Ulpa filters in AHUs0E4800060020% more EE filters = 4% of total Electricity = 600MWh =48.000 EUR/y + 600t CO2/y reduction = potentially 30.000 EUR2022
10512.202112 of 15 PV plants with total of 1.3MWep715000E3000001500Lower CO2 footprint which is also a marketing or sales adut2022
1062022Chiler for Cosmetics in Preparation Process10000W69505000 Increase of production because of more adequate temperature for cooling all year long and achiving tempearatures not possible with well water cooling2022